top of page

Gascoyne River Project

October 2022 - December 2025

With funding received from Gascoyne Development Commission and with the support of Rangelands NRM, GPRI (formerly GCG) developed a unique project that starts at a whole catchment level before focusing on key locations for on ground rehydration/rehabilitation works.  The project will delivery a catchment wide hydrology survey before working with seven pastoral properties in the catchment to plan, monitor and deliver ground works.

With funding received from Gascoyne Development Commission and with the support of Rangelands NRM, Gascoyne Catchments Group developed a unique project that starts at a whole catchment level before focusing on key locations for on ground rehydration/rehabilitation works.  The project will delivery a catchment wide hydrology survey before working with seven pastoral properties in the catchment to plan, monitor and deliver ground works.

The projects planned outcomes include:

- Improve the ecological health of the Gascoyne River catchments through undertaking targeted hydrological interventions that improve soil moisture and vegetation cover.
- Prove rehydration methods and techniques that are best suited to local conditions.
- Raise awareness and adoption of optimal rehydration and land management practices among  pastoralists.
- Support sustainable growth of the pastoral sector in the Gascoyne Region, and resilience under a changing climate.
- Maintain and improve natural capital, including soil health, carbon sequestration and biodiversity to improving overall rangeland condition and resilience.

CONTACT US

ABN: 72 563 576 629

c/- Lyons River Station
CARNARVON WA 6701

  • Facebook
  • Instagram
GPRI

© 2025 Gascoyne Pilbara Rangelands Initiative Inc.

Image credits to Genevie  Robison, Heidi Smith, Kristie de Pledge & Krystie Bremer

Powered and secured by Wix

bottom of page